‹ All Posts
Dharmesh Bhatt

11 mins ago · SEBI Registration INH000009685

Diamond Power Enters HVDC Segment with ₹707.80 Crore Order

DIACABS Diamond Power Infrastructure Limited (DICABS) has secured a major purchase order worth ₹707.80 crore (inclusive of 18% GST) from Adani Energy Solutions Limited (AESL) for the supply of overhead transmission conductors. Received on November 19, 2026, this contract marks Diamond Power's official entry into the High Voltage Direct Current (HVDC) transmission sector. - Key Highlights - Order Value: ₹707.80 crore including GST (basic value of ₹599.83 crore excluding GST, covering packing, forwarding, freight, and transit insurance) Client: Adani Energy Solutions Limited (AESL) Project: ±800 kV, 6,000 MW Bhadla–Fatehpur HVDC transmission corridor (~950 km link evacuating renewable energy from Rajasthan to northern India) Product Scope: Supply of 9,059.33 km of AL-59 conductors on a Delivered-at-Place (DAP) basis, comprising 8,948.33 km of AL-59 Lapwing and 111 km of AL-59 Moose conductors Execution Timeline: Month-wise deliveries scheduled for completion on or before December 31, 2027 Risk-Mitigated Pricing: Structured on a commodity back-to-back basis with a price variation formula linked to base indices (LME aluminium at USD 2,550/MT, premium at USD 106/MT, and USD/INR at 87), shielding the company from raw material and currency fluctuations.

#Miscellaneous#FundamentalViews#StockInNews
Daimond power.pdf
1 like