‹ All Posts
RAJIV GUPTA (SEBI RA)

7th Apr 2025 · SEBI-Registered Analyst

New Installations - Tata Power Company Ltd

Code BSE: 500400 NSE:

TATAPOWER
Tata Power to Install 100 MW Battery Energy Storage System (BESS) in Mumbai The entire 100 MW system will be installed across 10 strategically located sites, especially near load centres across Mumbai Distribution, centrally monitored and controlled from Tata Power’s Power System Control Center (PSCC). Future plans include the integration of BESS into the Distributed Energy Resource Management System (DERMS) to enhance operational efficiency. Tata Power remains committed to "Safety First", incorporating three layers of temperature monitoring and fire suppression systems at the cell, module, and rack levels within the BESS. The system will have high round-trip efficiency with reduced auxiliary consumption, thereby enhancing operational performance and extending the storage system's lifespan to support Mumbai’s energy sustainability goals.

#StockInNews#WatchOutFor
tatapowercol.pdf
237 likes·71 comments