‹ All Posts
Pyrifera Investment Advisors

20th Jul · SEBI-Registered Analyst

VA TECH WABAG Secures Major DBO Wastewater Order from BWSSB

VA TECH WABAG has secured a 'Large' category domestic order (valued between ₹250–600 crore) from the Bangalore Water Supply and Sewerage Board (BWSSB) for the Design, Build, and Operate (DBO) of advanced wastewater treatment facilities in Bengaluru. Key Project Highlights: Capacity & Scope: Includes a 100 MLD and 60 MLD Sewage Treatment Plant (STP) at Byramangala and Bellandur, respectively, plus a 25 MLD Tertiary Treatment Plant (TTP) at Byramangala. Timeline: 36 months for EPC (Engineering, Procurement, Construction, and Commissioning), followed by a 7-year Operations and Maintenance (O&M) period. Advanced Technology: STPs will utilize the Activated Sludge Process with Biological Nutrient Removal, while the TTP will use Ultrafiltration. Strategic & Sustainability Impact: Circular Economy: The facilities will feature anaerobic sludge digestion with biogas-based captive power generation, significantly reducing the plant's energy footprint and greenhouse gas emissions. Market Position: This win reinforces VA TECH WABAG’s leadership in the municipal wastewater sector, providing a scalable model for resource recovery while directly addressing Bengaluru’s critical water security and rapid urbanization challenges. Outlook: The long-term 7-year O&M component ensures stable, annuity-style revenue visibility, complementing the company's robust domestic order book and commitment to sustainable water infrastructure. $WABAG

#WatchOutFor#StockInNews#TrendingSectors
790 likes·72 comments